PSP Bibliography





Notice:

  • Clicking on the title will open a new window with all details of the bibliographic entry.
  • Clicking on the DOI link will open a new window with the original bibliographic entry from the publisher.
  • Clicking on a single author will show all publications by the selected author.
  • Clicking on a single keyword, will show all publications by the selected keyword.



Found 1 entries in the Bibliography.


Showing entries from 1 through 1


2017

Navigating an earned value management validation led by NASA: A contractor s perspective and helpful hints

In 2012, The Johns Hopkins Applied Physics Laboratory (APL) was approved by the National Aeronautics and Space Administration (NASA) to move forward with Phase B of the Solar Probe Plus (SPP) Mission to design and build the first spacecraft to fly into the Sun s outer atmosphere and study its effects on planetary systems and human activities. While APL had successfully utilized its earned value management system (EVMS) on the Van Allen Probes mission, the SPP contract called for a "certified" EVMS, which required an in-depth ...

Liggett, William; Hunter, Howard; Jones, Matthew;

Published by: IEEE Aerospace Conference Proceedings      Published on:

YEAR: 2017     DOI:

Budget control; Compliance control; Contractors; Human resource management; Man machine systems; NASA; Network security; Personnel training; Probes; Project management; Space flight; Value engineering; Parker Engineering



  1